Reports 1-1 of 1 Clear search Modify search
PEM (Center)
takaaki.yokozawa - 11:47 Friday 07 February 2025 (32613) Print this report
Recovered the large shaker near the IFI chamber floor
[YokozaWashimi]

We recovered the connection of the large shake where is placed in the floor near the IFI chamber.

Excitation channel :
K1:PEM-EXCITATION_MCF0_RACK_1_EXC

When I injected the 100 Hz signal with 200 cnt, we can see the signal in seismometer.
Images attached to this report
Search Help
×

Warning

×