KAGRA Logbook
LHO
LLO
VIRGO
LHO
LLO
VIRGO
Reports
1-1
of
1
Clear search
Modify search
PEM
(
Center
)
hirotaka.yuzurihara
- 11:35 Friday 13 December 2024 (31998)
Print this report
Comment to Shaker injection test for the IFI chamber
(
31979
)
I succeeded to shake the shaker from the KAGRA DAC.
K1:PEM-EXCITATION_SR3_RACK_6_EXC
Sign-in
Search
Help
×
KAGRA Logbook sign-in
Enter your user details:
Username
Password
Sign-in
×
Warning
×
×
Images attached to this Report
Retrieving files...
×
×
Search
Sections...
AOS
CAL
ChiefMeeting
CRY
DAS
DetChar
DGS
DMG
FCL
GIF
IOO
ISC
LAS
Logbook admin
MIF
MIR
OBS
PEM
PSL
Safety
SQZ
VAC
VIS
Tasks...
General
IFI
IMC
IMMT
ITF Control
Noise Budget
OMC
OMMT
OR
AND
EXACT
CLEAR
SEARCH
×
Add downtime event
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Event start:
Event end (* both the date and time must be entered):
* The downtime event will pass on to the next Operations Report, until both an end date and time are added.
Save downtime event
×
Add pending action
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Event start:
Event end (* both the date and time must be entered):
* The action will remain pending until both an end date and time are added.
Save pending action
×
Add oncall event
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Intervention type
-- Select an intervention type --
On site
From remote
Operator on site with expert from remote
Other
Event start:
Event end (* both the date and time must be entered):
* The oncall event will pass on to the next Operations Report, until both an end date and time are added.
Has the oncall intervention ended?
No
Yes
Save oncall event