DGS (General)shoichi.oshino - 15:07 Thursday 08 August 2024 (30781)
Print this reportInstalled UPS in the rack in the circuit room[Ikeda, Nakagaki, Oshino]
We installed the 1500VA UPS in the rack in the circuit room. The KVM was replaced to accommodate this work. In addition, the power and LAN cables were rewired.