[Kimura, Uchiyama, Yasui, M. Takahashi, Nakajima (MIRPRO) and Kawada (MIRPRO)]
On June 24, we closed or connected following flanges and bellows of OMMT and OMC vacuum chambers, etc.
1. one K-400 side flange of OMMT
2. bellows between OMMT and OMC
3. top flange of OMC
4. moved a dry-pump from PR-2 to near OMMT, and connected electric power suppy line