Reports 1-1 of 1 Clear search Modify search
VIS (OMM)
tatsuki.washimi - 18:08 Wednesday 05 June 2024 (29764) Print this report
Comment to Stack test @ Mitaka for the OMC (29643)

[R.Takahashi, Washimi] work on June 4th @ Mitaka

We measured the TF(V) of the test stack after ~20 hours of continuous loading weight (+155 kg), without any other changes.
Measurements just after removing the weight were also performed.

In the results, the TF with additional weight was shifted to a higher frequency.
The TF without additional weight was not changed so much.

The structure at high frequency should be due to the deformation of the rubbers of the jig.

Images attached to this comment
Search Help
×

Warning

×