Reports 1-1 of 1 Clear search Modify search
VIS (PR3)
ryutaro.takahashi - 21:52 Wednesday 08 May 2024 (29430) Print this report
Cable check

[Ikeda, Takahashi]

We checked the resistance and inductance of the LVDT coils for the BF damper at the feedthrough flange with the flip cable.

  Last time This time

BF H1

1-6

2-7

3-8

4-9

5-G

 

11.5Ω/1037.5uH

12.2Ω/8.569mH

OL

OL

OL

 

11.9Ω/1036.5uH

12.5Ω/8.565mH

OL

OL

OL

BF H2

1-6

2-7

3-8

4-9

5-G

 

11.2Ω/1049.2uH

12.3Ω/8.567uH

OL

OL

OL

 

11.4Ω/1049.1uH

12.5Ω/8.562mH

OL

OL

OL

BF H3

1-6

2-7

3-8

4-9

5-G

 

11.6Ω/1046.3uH

12.3Ω/8.568mH

OL

OL

OL

 

11.5Ω/1046.0uH

12.5Ω/8.565mH

OL

OL

OL

BF V1

1-6

2-7

3-8

4-9

5-G

 

11.5Ω/1039.5uH

12.4Ω/8.561mH

OL

OL

OL

 

12.2Ω/1041.0uH

12.4Ω/8.568mH

OL

OL

OL

BF V2

1-6

2-7

3-8

4-9

5-G

 

11.6Ω/1021.8uH

12.5Ω/8.587mH

OL

OL

OL

 

11.4Ω/1021.4uH

12.5Ω/8.589mH

OL

OL

OL

BF V3

1-6

2-7

3-8

4-9

5-G

 

19.7Ω/1052.1uH

12.3Ω/8.563mH

OL

OL

OL

 

12.1Ω/1051.7uH

12.5Ω/8.557mH

OL

OL

OL

Search Help
×

Warning

×