Reports 1-1 of 1 Clear search Modify search
VIS (PR2)
ryutaro.takahashi - 21:41 Wednesday 08 May 2024 (29429) Print this report
Cable check

[Ikeda, Takahashi]

We checked the resistance and inductance of the LVDT coils for the BF damper at the feedthrough flange with the flip cable.

  Last time This time

BF H1

1-6

2-7

3-8

4-9

5-G

 

11.7Ω/1039.7uH

13.3Ω/8.561mH

OL

OL

OL

 

12.0Ω/1040.6uH

12.5Ω/8.561mH

OL

OL

OL

BF H2

1-6

2-7

3-8

4-9

5-G

 

11.2Ω/1038.7uH

11.3Ω/8.554uH

OL

OL

OL

 

11.5Ω/1040.3uH

12.5Ω/8.552mH

OL

OL

OL

BF H3

1-6

2-7

3-8

4-9

5-G

 

11.3Ω/1042.7uH

12.3Ω/8.573mH

OL

OL

OL

 

11.6Ω/1041.1uH

12.5Ω/8.577mH

OL

OL

OL

BF V1

1-6

2-7

3-8

4-9

5-G

 

11.3Ω/1040.3uH

12.4Ω/8.553mH

OL

OL

OL

 

11.5Ω/1039.2uH

12.5Ω/8.562mH

OL

OL

OL

BF V2

1-6

2-7

3-8

4-9

5-G

 

11.3Ω/1016.3uH

12.8Ω/8.545mH

OL

OL

OL

 

11.5Ω/1016.3uH

12.9Ω/8.551mH

OL

OL

OL

BF V3

1-6

2-7

3-8

4-9

5-G

 

11.3Ω/1039.3uH

12.2Ω/8.567mH

OL

OL

OL

 

11.4Ω/1041.2uH

12.5Ω/8.253mH

OL

OL

OL

 

 

Search Help
×

Warning

×