Reports 1-1 of 1 Clear search Modify search
VAC (PR2)
takashi.uchiyama - 16:55 Tuesday 07 May 2024 (29413) Print this report
The top chamber of PR2 has been closed
2024/05/07

Kimura, mTakahashi, Sawada, Nakajima, Uchiyama

We closed the top chamber of PR2.

We found that a pushing bolt was left at the flange between the body and the top. The bolt could not be pull out.
We checked that The edge of the bolt reach the flange surface or not. It dose not reach.
So we left it.
Comments to this report:
takashi.uchiyama - 10:39 Thursday 09 May 2024 (29438) Print this report
Kimura-sama left a message about the pushing bolt on the chamber
Images attached to this comment
takashi.uchiyama - 17:03 Thursday 09 May 2024 (29447) Print this report
2024/05/09

Kimura, mTakahashi, Sawada, Nakajima

They rotated the pumping unit of the -X side of PR2. The unit number is 2.

Now, the ion pump is the -Yside which is the POP table side.
TMP is the +Y side.
Images attached to this comment
Search Help
×

Warning

×