Reports 1-1 of 1 Clear search Modify search
VIS (PRM)
takafumi.ushiba - 17:49 Friday 26 April 2024 (29340) Print this report
Check of PRM MISALIGNED_BF state for high power beam dump

I checked PRM MISALIGNED_BF state, which is used for hitting the PRM reflection beam to the HPBD.
Figure 1 shows the state of PRM and thermometers on HPBD.
T cursor shows the time when PRM reached MISALIGNED for BF state.
After that, HPBD temperature increased gradually, which means the reflection beam hit the HPBD.

Images attached to this report
Search Help
×

Warning

×