[Hirata, Ikeda-san]
We apply First contact to PR2 mirror. We will pill off them tomorrow morning.
1.Lock Suspension(IM→RM→TM)
2.Cleaning(floor, inside chamber by vectra-α with ethanol and vacuum cleaner)
3.Surface inspection of HR and AR side by photo
4.Set FC jig
5.FC apply(AR→HR)
Before appling FC, we saw some edge and footprint of FC on HR and AR side. Those are 500mm or 600mm away from the center.
And also we saw some dots and small dust near the center. We will check it tomorrow morning after pill off FC.
Photo shooting was very difficult like PRM.(Especially AR side)
I uploaded today's photo to KAGRA dropbox.