[Yokozawa, Ushiba]
We checked IX payload and found that one of EQ stops from MNR was touched to MN (fig1).
So, we moved EQ stop not to hit MN and then suspension can be aligned state.
Then, we adjusted all EQ stops and take photos for the record.
Photos can be seen from the following link:
https://www.dropbox.com/scl/fo/o4pp1ednlbpmlt8ldzcei/h?rlkey=xwwrpcc8takxpj1ca63jsjor1&dl=0
We haven't finished OpLev path check yet, so we need to do it at some point.