[Ikeda, Washimi, Takahashi]
We applied new cabling to the primary coils for the BF damper. The lead wires were re-cabled on the side of the coil bobbin with the PEEK tie-anchor or the PEEK plate. Additionally, the lead wires were fixed on the coil bobbins with an adhesive (TRA-BOND 2116).