Reports 1-1 of 1 Clear search Modify search
VIS (EY)
satoshi.tanioka - 7:30 Friday 12 January 2024 (28252) Print this report
ETMY MN OpLev centering

Takaaki Yokozawa, Satoshi Tanioka

We centered the ETMY tilt OpLev beam by adjusting the QPD position. The first picture shows the current situation of the tilt OpLev.

Then, we checked the MN roll OpLev beam, and it was off by a few cm above the BS as shown in the second picture. We did not try to center this OpLev at this moment.

Images attached to this report
Search Help
×

Warning

×