[Ishikawa, Tanaka, Komori]
We placed additional RFPDs on the REFL table, but we were not able to complete the task.
The remaining tasks will be finished tomorrow morning.
What We Accomplished:
- Installed all the additional optical components on the table.
- Established connections with the corresponding ports (klog:26361) at the rack side.
- Verified the functionality of the DC signals from the two RFPDs.
Plan for Tomorrow:
- Thread the remaining cables through the hole for signal cables and establish connections at the table side.
- Perform power tuning and alignment.