[Uchiyama, Ushiba]
Continued work from klog26178.
Abstrct:
We replaced BSW27 to NPPH(+/-5%)Q-50.8C08-20-W0.5D-1064.
After that, we realigned all optics for RF PD, RF QPDs, camera, and S/P pol monitors.
Then, we dumped stray light by using KG5 or LB1.
Detail:
Uchiyama-san found Sigma-koki 2-inch BS (NPPH(+/-5%)Q-50.8C08-20-W0.5D-1064), so we first replaced BSW27.
After that, we realignd the beam to PDA1 and PDA2, and also put beam dump to catch surface reflection of PDs.
Then, we locked PRMI with bright condition and work for the other alignments.
S/P pol monitor PDs and cameras are set and their surface reflections were also dumped.
We also aligned the beam to WFS QPDs.
Since the beam height on the mirror of WFS path is too high, we set some spaces and change the height of steering mirrors.
Afer the alignment, we also set beam dump for surface reflections of QPDs.
After te above realignment, we checked the surface relffection from POP FORWARD QPDs.
Though we cannot move them because they are used for the refence of injection beam, the surface reflection from the QPDs could be caught by beam dump.
After the work, we finally check all the optics we moved and placed are fixed well.
Note:
During the work, we felt the beam on POP WFS QPDs are large and comparable with the QPD size.
I'm not so sure but before using these signals to control, it might be better to check the beam profile again.