OBS (Summary)shoichi.oshino - 16:10 Saturday 27 May 2023 (25406)
Print this reportOperation Shift SummaryOperators name: T. Yokozawa, S. Oshino Shift Time: 08-16 (JST) Summary:
Check Items: VAC,CRY,TEMP There was no problem. The temperature of EY 50K cooler is increasing.
09:32 lock loss 09:47 observation mode (automatically recovered, GRY was recovered to TEM00 mode (klog25399)) 15:51 lock loss, PR3 alignment was starting