KAGRA Logbook
LHO
LLO
VIRGO
LHO
LLO
VIRGO
Reports
1-1
of
1
Clear search
Modify search
PEM
(
Center
)
takaaki.yokozawa
- 8:06 Wednesday 17 May 2023 (25269)
Print this report
Comment to Acoustic injection test at OMC area
(
25266
)
07:41:06 - 08:01:20 (JST)
800 -900 Hz with 1 Hz resolution
100 count injection
10 s in each frequency
Images attached to this comment
Sign-in
Search
Help
×
KAGRA Logbook sign-in
Enter your user details:
Username
Password
Sign-in
×
Warning
×
×
Images attached to this Report
Retrieving files...
×
×
Search
Sections...
AEL
AOS
CAL
ChiefMeeting
CRY
DAS
DetChar
DGS
DMG
FCL
GIF
IOO
LAS
Logbook admin
MIF
MIR
OBS
PEM
Safety
VAC
VIS
Tasks...
OR
AND
EXACT
CLEAR
SEARCH
×
Add downtime event
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Event start:
Event end (* both the date and time must be entered):
* The downtime event will pass on to the next Operations Report, until both an end date and time are added.
Save downtime event
×
Add pending action
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Event start:
Event end (* both the date and time must be entered):
* The action will remain pending until both an end date and time are added.
Save pending action
×
Add oncall event
Sub-system
-- Select a sub-system --
Air Conditioning
Calibration
DAQ
DET
DMS
Electricity
EnvMoni
ISC
ISYS
Network & GSS
On-line Computing & Storage
Other
SBE
SQZ
SUSP
TCS
Vacuum
Intervention type
-- Select an intervention type --
On site
From remote
Operator on site with expert from remote
Other
Event start:
Event end (* both the date and time must be entered):
* The oncall event will pass on to the next Operations Report, until both an end date and time are added.
Has the oncall intervention ended?
No
Yes
Save oncall event