[X-end: Yokozawa, Yamazaki]
[Y-end: Washimi, Murakoshi]
[Control room: Ushiba, Yuzurihara, Suzuki, Ishikawa]
[Remote: Akutsu, Tomaru, and many people]
Today we performed the tapping test mainly X/Y-end and around IY.
We found the following excess (see also the plots).
- TMSY (Leg, Table): 70-150 Hz
- TMSX (Leg): ~140 Hz, ~280 Hz
- TMSX (Cover): ~70 Hz, ~110Hz
- EXT (Bellows leg): ~140 Hz
- EYT (Bellows leg): ~80 Hz
- Beam duct between IYC and BS: ~10 Hz, 30-40 Hz, ~70Hz
There was no excess at
- EXT/EYT chambers body
- around EXC/EYC/IYC chambers (body, cryocoolers, ground, large flanges, booth frame, booth 2F, bellows, beam duct)
- around EXA/EYA/IYA chambers (body, bellows, legs, ground, side flanges, beam duct)