Reports 1-1 of 1 Clear search Modify search
MIF (General)
takaaki.yokozawa - 13:17 Wednesday 22 March 2023 (24490) Print this report
Preliminary tapping test around BS
I performed the tapping test around BS area.
Fig.1. Beamduct at the +X side
Fig.2. Beamduct between BS and SR2 (-Y side)
Figures are placed in here

During the tapping test at the +Y side of the beam duct, lock was loss (There are possibility to be lock loss due to this tapping test)
Search Help
×

Warning

×