MIF (General)takaaki.yokozawa - 13:17 Wednesday 22 March 2023 (24490)
Print this reportPreliminary tapping test around BSI performed the tapping test around BS area. Fig.1. Beamduct at the +X side Fig.2. Beamduct between BS and SR2 (-Y side) Figures are placed in here
During the tapping test at the +Y side of the beam duct, lock was loss (There are possibility to be lock loss due to this tapping test)