Reports 1-1 of 1 Clear search Modify search
MIF (General)
masahide.tamaki - 18:08 Monday 25 July 2022 (21594) Print this report
Power Budget Measurement (preparation)

[Ushiba, Tamaki]

Today we prepared to measure power budgets (Memo 1).

Memo 1

First, to find out the PD and QPD values in the absence of laser light, the shutter was lowered and their averages were taken (Memo 2).
(Something wrong? with REFL_QPD2 --- When leaser shutter was lowered, its count was stil more over than 2600)
Then we set up the power meter and tripod.

However,  just as we were about to start taking measurements, there was a problem with the laser.
That problem was solved, but as the laser had just been switched on again, we couldn't resume work immediately.
So we will do tommorow.

Memo2

The values of QPDs and PDs in the dark are shown in the table below.

*cdsutils avg 5 (CHANNELNAME)

IMC_CAV_TRANS 1.123
MCE_TRANS_QPDA1 SEG1 -1.856
SEG2 -5.395
SEG3 -3.620
SEG4 -0.961
MCE_TRANS_QPDA2 SEG1 -3.786
SEG2 -1.017
SEG3 -2.738
SEG4 -2.607
IMMT1_TRANS_QPD1 SEG1 -5.533
SEG2 -2.585
SEG3 -4.326
SEG4 -4.389
IMMT1_TRANS_QPD2 SEG1 -4.360
SEG2 -1.835
SEG3 -1.543
SEG4 -0.796
ASC_POP_FORWARD_QPD1 SEG1 -3.914
SEG2 -3.920
SEG3 -3.933
SEG4 -3.772
ASC_POP_FORWARD_QPD2 SEG1 -5.677
SEG2 -6.106
SEG3 -5.265
SEG4 -3.528
REFL_PDA1 4.837
REFL_PDA2 2632.236
(something wrong?)
Images attached to this report
Search Help
×

Warning

×