Reports 1-1 of 1 Clear search Modify search
VIS (SR2)
fabian.arellano - 16:54 Tuesday 22 March 2022 (20185) Print this report
Preparation for cleaning the mirror.

With Hirata-san and Yasui-san.

Summary: we set the payload ready for the application the First Contact.

  • We locked the suspended optical table.
  • We locked the payload using the security structure screws in the IM, IRM, RM and mirror.
  • Additionally, we fixed the RM onto the security structure beneath with two loops of PEEK cable ties.
  • We adjusted the height and the lateral position of the protective jig, and brought it into contact with the HR surface of the mirror.
  • We checked there were no significant gaps between the two using a brush and watching from the AR side.
Images attached to this report
Search Help
×

Warning

×