terrence.tsang - 16:33 Tuesday 25 January 2022 (19557) Print this report
BS Tower control and Guardian

I measured and fit transfer functions for IP L, T, Y, and F0, F1, BF, GAS DoFs.
These are just routine transfer function measurements and fitting like previous ones so I won't repeat the descriptions.
Fits are shown in Fig 1-6.
To reproduce: /kagra/Dropbox/Subsystems/VIS/vis_commissioning/bs/notebook/transfer_function_fit/

DC controls are made using similar criteria as that of the SR2, SR3, and ETMY.
OLTFs and filters are shown in Fig. 7-13.
Typically, I obtain a perfect cancellation notch filter from the IM V transfer function for the BF GAS stage.
Since I couldn't measure good transfer functions for the payload due to alignment work, I improvised one for now.
To reproduce: /kagra/Dropbox/Subsystems/VIS/vis_commissioning/bs/notebook/control/
For the F1 setpoint, I have changed it from (787 to 0) for now.
F1 is not calibrated and the final setpoint is unknown.

I have modified the Guardian config file and now ISOLATING state engages all filters and controls the tower properly.