UPS battery at U1-2 in N1 rack was also replaced as a hot-swap. Attachments are the installed date (some of them are pre-installed ones) and the expired date of N1, B1, IX0, A1, A2, and H1 racks. (Maybe one more UPS is installed in PSL room. But I haven't checked yet.)