FCL (Network)shoichi.oshino - 15:10 Thursday 06 January 2022 (19370)
Print this reportInstall new network switch at IXA and IYA area[Yokozawa, Oshino]
We installed new network switch at IXA and IYA area. However, because the LAN cable was not long enough, it could not be connected to the switch in the machine room. We will extend the LAN cable next week to see if we can connect it.