[Takahashi, Sato]
We assembled the accelerometers for EY.
- Assembled the base plates with the adjustment screws.
- Set the folded pendulum bodies on the base plates.
- Removed the original position sensors (capacitors) from the bodies.
- Attached the LVDT coils onto the bodies.
- Replaced the coaxial LEMO connectors to the 2-pin LEMO connectors.
- Soldered the actuator coils to the connectors. Checked the resistance.
ACC | Primary coil | Secondary coil | Actuator coil |
Al-#1 | #10 | #10 | 54.4Ω |
Al-#2 | #11 | #11 | 56.4Ω |
Al-#3 | #12 | #12 | 53.7Ω |