Reports 1-1 of 1 Clear search Modify search
PEM (EY)
tatsuki.washimi - 12:07 Wednesday 13 October 2021 (18556) Print this report
Water fluid meter maintenance

[Yoshimura, Takase, Washimi, and Hightec inc.]

We performed maintenance for the water fliad meter over the Y-end.

  1. Instllation a new SUS plate to save the flow velocity
  2. Instllation an analog measure
  3. Calibration for the level meter (-2cm)
  4. Fix the controler on the wall
Images attached to this report
Search Help
×

Warning

×