On Apr. 30, 2021. For preparation to do remedy in the IFI chamber, I detached the duct connecting between the IFI chamber and the optics table for IFO_REFL. And detached the high-quality viewport.
On Apr. 30, 2021. For preparation to do remedy in the IFI chamber, I detached the duct connecting between the IFI chamber and the optics table for IFO_REFL. And detached the high-quality viewport.