[Takahashi, Sato, Horiuchi + CRY (Tomaru, Ushiba)]
We connected the cables for cryo-payload to the BF.
- Two 5-mm spacers and two 7.5-mm pipes were used for the janction box to connect the maraging wires.
- New small hexagon was used to fix the cables on the wire.
- The cables were connected to the upper connector cables and fixed to the side plates on the BF cup.