Reports 1-1 of 1 Clear search Modify search
VAC (General)
masayuki.nakano - 12:23 Monday 18 January 2021 (15767) Print this report
KOACH preparation for IMMT alignment work

[Akutsu, Yokozawa, Nakano]

We put the KOACHs for the IMMT alignment work. The location of the KOACHs is shown in the attached figure (first one).

  • To share the KOACHs with Type-B team, we need to move the KOACHs located between PR3 chamber and beam tube to between PR2 chamber and beam tube shown in the second figure. Then, we can bring two KOACHs to BS. We will move them, if we need to work tomorrow.
     
Non-image files attached to this report
Search Help
×

Warning

×