Reports 1-1 of 1 Clear search Modify search
AOS (Beam Reducing Telescopes)
tomotada.akutsu - 0:48 Friday 06 September 2019 (10365) Print this report
Putting two IR-QPDs for GPT of TMSY

Yamada, Akutsu

  • Put two IR-QPDs for Gouy phase telescope of TMSY at Yend. RQPD1 was placed at 20*25 = 500 mm away from RST3, while RQPD2 was placed at 760 mm away from RST3. Based on Fig 4 of 10337. If this setup works well, then we need to revise the drawing here, according to Fig. 1. The beam profiles where the QPDs would be placed are in Fig 2 and 3 (RQPD1 and RQPD2, respectively).
  • Then we somehow centered the beam spots on the QPDs... somehow. As the spots are tilted elliptical, balancing the four outputs from the QPDs was hard.
Images attached to this report
Comments to this report:
keiko.kokeyama - 9:03 Friday 06 September 2019 (10370) Print this report
Search Help
×

Warning

×