Continued to attach the stress relief structures to the connectors of the cables, and completed. Then I installed them to TMS-VIS-Y. Now all the cables are connected to the flanges.
Next: flipper cables are needed to connect the flange to the Dsub cables outside, so we need to assemble the flipper cables.