Reports 1-1 of 1 Clear search Modify search
AOS (Baffles & Beam dumps)
tomotada.akutsu - 18:49 Wednesday 09 January 2019 (7596) Print this report
Comment to WAB finalization at IYC (7590)

Simon, Yano, Akutsu

Continued the finalization of the WAB at IYC.

Easy heat link: Yano-san assembled an easy heat link at the Mozumi office this morning. Just used Y-type tags and two 30cm single electric wires (not strand ones). And then washed it. It was attached to the WAB suspension to connect the upper and the lower part with two M3-5 screws, the flat washers, and the spring washers.

Connecting electric wires of the thermometers: connected electric wires from the thermometers attached to the WAB and the suspension structure yesterday. We used P23 burndy connector (Fig 3 and 4), and the pin assign is:

  • ABCD: V-, V+, A-, A+ in this order, and the pins are from the WAB itself
  • EFGH: V-, V+, A-, A+ in this order, and the pins are from the suspension structure

and checked the diode's directions at the edge of the cable outside (Fig 5).

Images attached to this comment
Search Help
×

Warning

×