The attached file is the configuration of the PSL room, the compressor, the air conditioner, and the FFU units around the PR, the MC, the BS, and the SR area during the CARM locking with IR.
The attached file is the configuration of the PSL room, the compressor, the air conditioner, and the FFU units around the PR, the MC, the BS, and the SR area during the CARM locking with IR.