Remotely,
The attached shows the drifts during pumping down (started from 15:45JST on Aug. 30th, and the plots stopped at ~23:59 30th though), measured at IP/GAS/BF-LVDTs. The amout of the drifts looks not so huge though it looks the positions of the IP-L/T(/Y) are to be aligned to the original position again by STM..
Except for this, Now the RTmachine for ITMX (k1ix1) is not working properly (ADC cards are not recognized and this might be due to bad cable connection around the I/O chassis.. The connection will be checked soon) Then *the data aquisition at ITMX is stopped from ~10:00JST*. the drift looks calmed down already though.. this will be solved soon.
reference: https://www.icrr.u-tokyo.ac.jp/~yuzu/bKAGRA_summary/html/2018-08-30.html#VIS-ITMX_2018-08-30