On Aug 23th 2018,
We released the ACCs ad the those feedback loops were successfuly closed.
ITMX is now freely suspended (except for F0-GAS). Finally we got all the signals.
TM/coil driver test, TF measurement, sensor/actuator-diagonalization will be done soon next.