[Takahashi, Ishizaki, Sato, Shindo, Miyo, Okutomi]
Assembly of the Dummy Payload (DP) and the Bottom Filter (BF) installed into the chamber
- We should wait for the protection net back to do remaining works on the installed stages
-
Remaining works:
- Cabling of the release sensors
-
Takahashi-san did deburring on the hole of the wrong wire receptacle and now the maraging wire fits on it
- He reported it's not a design problem, but some burrs which remain on the edge disturbed the wire
-
This receptacle for the keystone of the BF has different shape than other new receptacles for Standard Filters
- It means that other new receptacles are free from this problem
- I note that the same parts for other Type-A should be care about that however they are nor procured yet
-
Cap screws on the EQ-stop which support the BF from its bottom are used in correct direction while ones for the DP are not (as reported in klog #2452)
- Instead of using it upside down, we added nuts and gain height
- The height is adjusted as 50 mm to let all weight of the BF not to load on the release sensor but on these screws
Photos >>> https://goo.gl/photos/xZ9sHCp1RDWc4eJdA