Reports 1-1 of 1 Clear search Modify search
VIS (EY)
koki.okutomi - 18:52 Thursday 09 February 2017 (2460) Print this report
Dummy Payload + Bottom Filter installed into chamber

[Takahashi, Ishizaki, Sato, Shindo, Miyo, Okutomi]

Assembly of the Dummy Payload (DP) and the Bottom Filter (BF) installed into the chamber

  • We should wait for the protection net back to do remaining works on the installed stages
  • Remaining works:
    • Cabling of the release sensors
  • Takahashi-san did deburring on the hole of the wrong wire receptacle and now the maraging wire fits on it
    • He reported it's not a design problem, but some burrs which remain on the edge disturbed the wire
    • This receptacle for the keystone of the BF has different shape than other new receptacles for Standard Filters
      • It means that other new receptacles are free from this problem
      • I note that the same parts for other Type-A should be care about that however they are nor procured yet
  • Cap screws on the EQ-stop which support the BF from its bottom are used in correct direction while ones for the DP are not (as reported in klog #2452)
    • Instead of using it upside down, we added nuts and gain height
    • The height is adjusted as 50 mm to let all weight of the BF not to load on the release sensor but on these screws

Photos >>> https://goo.gl/photos/xZ9sHCp1RDWc4eJdA

Images attached to this report
Search Help
×

Warning

×