Reports 1-1 of 1 Clear search Modify search
VIS (IY)
ryutaro.takahashi - 20:18 Thursday 11 March 2021 (16237) Print this report
Comment to Preparation for disconnection of cryo-payload (16214)

[Takahashi, Sato, Horiuchi + CRY]

The cryo-payload was disconnected.

  1. Pushed down the BF keystone.
  2. Unhooked the maraging wire from the receptacle on the PF.
  3. Lifted up the BF with bottom stoppers. The height of BF was 78mm.
  4. The cryo-payload was removed from the cryostat by CRY members.
Search Help
×

Warning

×