[Takahashi, Sato, Horiuchi + CRY]
The cryo-payload was disconnected.
- Pushed down the BF keystone.
- Unhooked the maraging wire from the receptacle on the PF.
- Lifted up the BF with bottom stoppers. The height of BF was 78mm.
- The cryo-payload was removed from the cryostat by CRY members.