[Takahashi, Sato, Horiuchi]
We prepared for the disconnection of cryo-payload.
- Opened the top chamber. Fixed the IP.
- Opened the cross tube. Fixed the BF.
- Removed the additional FR.
- Dismounted the ACCs with covers.
- Removed the yaw FR.
- Dismounted the ballast rings.
- Connected the release sensor box.
- Pushed down the F0 keystone so that the F1 release sensor can indicate.
- Removed the BF damper coils.