Reports 1-1 of 1 Clear search Modify search
VIS (IX)
ryutaro.takahashi - 18:06 Friday 05 March 2021 (16171) Print this report
Comment to Setup of filter chain (16118)

[Takahashi, Sato, Horiuchi]

  1. Set the height of secondary coil to -20mm.
  2. Calibrated the LVDT in the F0 (plot1).
  3. Measured the rage of FR (plot2).
  4. The height of F0 keystone was -19.0mm with the ballast (25 +5x5 +1.8 +0.5 = 52.3kg).
Images attached to this comment
Search Help
×

Warning

×