Continued from yestereday; Yano, Akutsu
Did some remaining things.
- A PEEK birndy connector was attached to thermometers' pins. I basically believe the connection is ok, according to an easy check: I touch each thermometer and Yano-san checked the output value rised at the cryocon (named IY7:Frame. E and F are for the WAB and its suspension, respectively). My concern was that the temperature rise was only about 1 K or so. There was a tape on which "this has a gruond issue" so this might be related...?
- We brought back new and old traversers into the sheld at the side of the IMC vacuum tube. The 6N Al heat links that were previously used were left in the IYC clean booth together with the other small but necessariy parts on the metal rack.