Reports 1-1 of 1 Clear search Modify search
VIS (IX)
ryutaro.takahashi - 20:53 Tuesday 02 March 2021 (16127) Print this report
Comment to Setup of filter chain (16118)

[Takahashi, Sato, Horiuchi]

  1. Fixed the blades for vertical FR in the F0.
  2. Attached the yaw FR in the F0.
  3. Mounted the ballast on the top plate of F0 so that the height of keystone can be -6mm (big cylinder 25kg + circle plate 5kg x4 + big block 1.8kg x2 + small block 0.4kg = total 49kg).
  4. The BF height was 68/68/74mm, and the keystone height was 67.5mm (4000count). Then the TM height was -11.2mm (see klog)
  5. Removed the balllast from the BF cup (moving mass 2.4kg x2 = total 4.8kg). The F1, F2, and F3 went to the operation range.
  6. Set the height of F0 keystone to -23mm. The BF height was 75/74/73mm, and the keystone height was 67.5mm (4400count). Finally the TM was lifted up by 4mm.
Images attached to this comment
Search Help
×

Warning

×