[Ikeda, Miyo-san, Oshino-san, Nakagaki-san].
2021/02/15 Implementation:
We have measured the cable length of the new network in the IXC and IYC areas.
For more details, please see the following document.
[Ikeda, Miyo-san, Oshino-san, Nakagaki-san].
2021/02/15 Implementation:
We have measured the cable length of the new network in the IXC and IYC areas.
For more details, please see the following document.