[Takahashi, Sato, Horiuchi, Miyo(remote)]
- Measured the TF with released BF keystone.
- Lifted down the F3 on the end plate.
- Fixed the cables on the top of BF cup.
- Implemented the cabling around the F3 cup.
- Checked all of connectors on the F3 and repaired some cables.
- Centered the position of F3 on the end plate.
- Set the side stoppers for the BF with gap of 1cm.
- Lifted down the EQ stop into the corrugate tube. The end plate for F3 sit down on the frame lock.