Reports 1-1 of 1 Clear search Modify search
VIS (EY)
ryutaro.takahashi - 20:11 Thursday 04 February 2021 (15932) Print this report
Setup of F3

[Takahashi, Sato, Horiuchi, Miyo(remote)]

  1. Measured the TF with released BF keystone.
  2. Lifted down the F3 on the end plate.
  3. Fixed the cables on the top of BF cup.
  4. Implemented the cabling around the F3 cup.
  5. Checked all of connectors on the F3 and repaired some cables.
  6. Centered the position of F3 on the end plate.
  7. Set the side stoppers for the BF with gap of 1cm.
  8. Lifted down the EQ stop into the corrugate tube. The end plate for F3 sit down on the frame lock.
Images attached to this report
Comments to this report:
kouseki.miyo - 7:48 Friday 05 February 2021 (15936) Print this report
Search Help
×

Warning

×