[Takahashi, Sato, Horiuchi]
- Released the BF. The height of F3 was 70mm.
- Released the kyestone of F3.
- The coil bobbins had touched each other. The horizontal position of LVDT-ACT coil was adjusted.
- Calibrated the LVDT in F3 (see plot #1).
- Tuned the BF at the mid point (41mm in height) of FR (see plot #2). Base weight was Original+4.748kg.
- Fiexd the ballast masses on the BF cup.
- Checked the range of FR (see plot #3).
- Fixed the keystone.