Reports of 196 Clear search Modify search
CRY (General)
kazuhiro.yamamoto - 17:49 Wednesday 18 March 2020 (13672) Print this report
Comment to Violin mode measured and observed (13654)
I wonder why the numbers of peaks are larger than 16 (number of fibers). It is my naive guess, but cross sections of fibers are not perfect circles. So,
each fiber can two spitted modes. Numbers of observed modes are less than 32.

And Q of modes looks on the order of 10^4 at least. It is fine.
FCL (Air)
kazuhiro.yamamoto - 0:39 Saturday 04 May 2019 (8808) Print this report
Comment to EXC temperature was enhanced by about 1 C due to cryocooler operation (8806)
On 8:50, Kimura-san and K. Yamamoto turned on cryocoolers for EXC. So finally, last sapphire cooling was started.
Photos are here.

https://photos.google.com/u/1/share/AF1QipOFv2iLIn9xQklJQfW1mfxyVm3_I24nelpbNVhRn9qe7Uci-o9ppx4GO0Nid1sFMw?key=dXNONHlqV1dWMlEtU1V4RVh0bGRnWmV4elhYTGt3
VIS (PR2)
kazuhiro.yamamoto - 0:37 Saturday 04 May 2019 (8807) Print this report
Comment to O-ring replacement work and PR2-suspension health check after (8805)
Kimura, Ito(MPC), K. Yamamoto, Yokozawa also replaced O-ring of SRM chamber and gasket of ICF152. Photos are here.

https://photos.google.com/u/1/share/AF1QipOFv2iLIn9xQklJQfW1mfxyVm3_I24nelpbNVhRn9qe7Uci-o9ppx4GO0Nid1sFMw?key=dXNONHlqV1dWMlEtU1V4RVh0bGRnWmV4elhYTGt3
CRY (Cryostat EX)
kazuhiro.yamamoto - 21:45 Thursday 02 May 2019 (8795) Print this report
Leak check at EXC
N. Kimura and K. Yamamoto

Kimura-san and Kazuhiro checked leakage at EXC; flange of cross tube above cryostat and small flange on side of cryostat.
The latter has no problem. But we found leakage on former. As Takashi Uchiyama suggested,we add 5 cramps and fasten all screws
(80 Nm).

Photos are here.

https://photos.google.com/u/1/share/AF1QipNbyPYSr0R5Jugb_d38anDCh6WYZObmVld6-9zV4Zk98dD1eFSX0Qi5Mj44XcNZfw?key=RVpBR1VzZ0hzVk4tMFBZak5FZ0VpZEdVU2x4WjFB
CRY (Cryo-payload IY)
kazuhiro.yamamoto - 20:46 Thursday 18 October 2018 (6609) Print this report
ITMY was packed !
(1)Today, strength test was over. Kuromiya (B4 at Toyama), Ito(B4 at Toyama) and Kazuhiro confirmed
ears on mirror.
(2)They close box (useful comments from Takafumi).
(3)Then this box which include ITMY is in pelican case now.
(4)Tulip television came. Kuromiya and Kazuhiro faced interviewed.
(5)Tomorrow morning (9am). Takyuki pick up. Kazuhiro comes. Tulip television comes again.
CRY (Cryo-payload EY)
kazuhiro.yamamoto - 23:28 Friday 07 September 2018 (6060) Print this report
ETMY IS at Y end !
Finally, ETMY IS at Yend ! Today (after about 1 month strength test ),
ETMY was transported from University of Toyama to KAGRA site.
https://photos.google.com/u/1/share/AF1QipObQWluMt6zI8mT2xCHFYhwMtlkLQ1nkl_HdTHWlsRf-VelDwjeDH_qDkDJzZaVZA?hl=ja&key=d3lDaTZtODRRaUIxTWdjbkw2WHdfWnNZeEI0QW9B

Yoshioka-kun, Kuromiya-kun (B4, University of Toyama) and Furuta-san supported.
Now case which includes ETMY is under table behind EYC.
CRY (Cryo-payload EY)
kazuhiro.yamamoto - 15:45 Friday 08 June 2018 (5225) Print this report
ETMY was deliered at Toyama
ETMY (Zygo) was deliered at Uniersity of Toyama. HCB mission will start on 11th (Mon) and will be finished on 22nd of June. Kazuhiro Yamamoto confirmed that both shock watches are not red.

Images attached to this report
CRY (Cryo-payload EX)
kazuhiro.yamamoto - 11:08 Friday 26 January 2018 (4032) Print this report
ETMX was delivered at Toyama !
The sapphire mirror, one of key part for bKAGRA phase 1 (and first KAGRA "practical not spare" sapphire mirror),
in other word, ETMX, was delivered around 9 am today (Friday, 26th of Jan 2018) at University of Toyama for
HCB (bonding of sapphire ears and magnets).
Although I was worried about terrible weather (heavy snow !) around Toyama,
actually, no problems and delay happened.

I would like to appreciate support of administration office of faculty of science and
efforts of young persons (Ushiba(ICRR), Kitazawa, Yokokawa, Yoshioka(Uniersity of Toyama)).

HCB mission will be started on Monday of the next week. According to current schedule,
ETMX will arrie at KAGRA site on 9th of March (Fri).

Here photos are.
https://photos.google.com/share/AF1QipN5f8ODPphztNA_wLHFUg1WpsYxpkwjxQLtzVofX2IRV9jLm7bLydBIpvdRqYXfUQ?hl=ja&key=UmtUbDcwZU93OGtpZGhkbEJMaTA2WE5MMGphRVhn
CRY (General)
kazuhiro.yamamoto - 10:43 Sunday 24 September 2017 (3411) Print this report
Comment to HCB for the ETMY at Toyama University (3402)
Could you summarize what you did on Wednesday, especially, position and angle of first ear ?

Thanks !
CRY (General)
kazuhiro.yamamoto - 13:14 Monday 11 September 2017 (3363) Print this report
ETMY was delivered at Toyama !
ETMY for bKAGRA phase 1 (Coastline) arrived at front clean room of University of Toyama !

https://photos.google.com/share/AF1QipMn0m7eBT28Laf97brhHGAQeqPK1yQfdJrrXSbTYFHrysHEEUoNcjzwuHuNCrbftw?hl=ja&key=ZzFXWnZnTC1nNTZ0a0VOWU83Yl96M3VSX0sxVFhR

HCB mission will be on week of 18th of September.
CRY (Cryostat IX)
kazuhiro.yamamoto - 21:36 Wednesday 28 June 2017 (3021) Print this report
Status of X front cryostat (accelerometer)
Luca Naticchioni, Syuhei Miyata, Kazuhiro Yamamoto

Yesterday(27th of June 2017), Luca investigated accelerometer at University of Toyama.
In principle, it is OK.

Today (28th of June 2017), Luca and Kazuhiro (and Miyata-kun, undergraduate student) brought
accelerometer and apparatus to KAGRA site.
Luca checked accelerometer on table in front of clean booth for cryostat.
It works.
So, we installed in cryostat.
However, output looks noisy. Cables connected to cryostat directly could be an issue
because we did not use it in test on the table.

We brought out acceleroemter from cryostat again.
Our intention is as follows;
Performance check outside cryostat via above cable on Friday (the day aftr tomorrow).

Photos are here.
https://photos.google.com/share/AF1QipNns91ll_U0DRfd22Xmmj5G1DobZNAcVRx95u0drHTDkPXU7aFICkvE_hSsETod3A?key=X1RVS3ZwbVEyc0xwbjhlWkc2cUhDU0NTOTZnMGV3

CRY (Cryostat IX)
kazuhiro.yamamoto - 22:25 Monday 26 June 2017 (3000) Print this report
Status of X front cryostat (accelerometer)
Luca Naticchioni, Shinji Miyoki, Kazuhiro Yamamoto

Luca checked accelerometer and confirmed that it does not work.
Oscillator itself does not break. Stepping motor is also OK.
Circuit might have issues.

We brought out accelerometer from cryostat and transport all items to University of Toyama.
Luca investigates.

Photo:
https://photos.google.com/share/AF1QipPDAF61GxcmKerSAras7Kme7KGVmE7PhoQbUbOiyY4CEO3Rs2KkHr_YWdBseP52ug?hl=ja&key=YXFVV3VtMnBiZXl0amtZVG8td2N6a1BTRUtnbzJB
CRY (General)
kazuhiro.yamamoto - 21:36 Monday 19 June 2017 (2944) Print this report
Sapphire blank bulk with sapphire ears and sapphire fiber holders moved from University of Toyama to KAGRA site !
Takafumi Ushiba, Kieran Craig, Toshikazu Suzuki, Takayuki Tomaru, Rahul Kumar, Kazuhiro Yamamoto

Strength test of HCB between sapphire blank bulk and sapphire ears at University of Toyama ended.
They survived in three weeks.

Unfortunatly, HCB between one of sapphire spacers for magnets and sapphire bulk
did not work (but it is not fault of HCB itself. We are afraid that this spacer was not
on bulk). Takafumi Ushiba and Kiran Craig measured position of jig for this spacer
and other spacers. They are sure that jig position is appropriate.

They and Kazuhiro packed box which includes sapphire blank bulk and put into Pelican case.
Kazuhiro drove his car (Kieran, Takafumi and HCB box were in his car).
HCB box arrived at clean booth for BS. Kieran and Takafumi put glue between spacer and bulk.
And now we wait until glue is dry.

Takayuki, Suzuki-san, and Rahul picked up parts of sapphire fiber holders at logistic center
(unfortunately, parts were not delivered in morning at University of Toyama). They washed in
ultrasonic bath at University of Toayama and brought.

CRY (Cryostat IX)
kazuhiro.yamamoto - 19:03 Monday 12 June 2017 (2901) Print this report
Status of X front cryostat (accelerometer)
Nobuhiro Kimura and Kazuhiro Yamamoto

Apparatus of cryogenic accelerometer were moved because of installation of cross duct above IXC cryostat.
Rome group asked Kazuhiro Yamamoto to check their accelerometer. So, Kimura-san and Kazuhiro move apparatus again
to recover. Now, they look what they were.

https://photos.google.com/share/AF1QipO1cVsAjv8fGmFqSoVjStmyBwLv-TyrrV8sOI_0beL_JQnwZ5A_lGkl8gLQjBOgRQ?hl=ja&key=QURyemNONnlhVkpKY1U1YW9wV21nMGd6c3FGc2pn

Kazuhiro is checking Rome accelerometer. He comes back on Thursday.
CRY (Cryostat IX)
kazuhiro.yamamoto - 0:23 Monday 29 May 2017 (2817) Print this report
Status of Cryostat (X front) on 25th of May 2017
[Toshiro Ochi, Kazuhiro Yamamoto]

Toshiro picked up some parts of accelerometer in shield.
Toshiro and Kazuhiro moved tables and measurement devices which were near clean booth of cryostat.
CRY (Cryostat IX)
kazuhiro.yamamoto - 21:52 Wednesday 24 May 2017 (2802) Print this report
Status of Cryostat (X front)
[Ochi,Hasegawa,Sawada,Kimura,Miyoki,Yamamoto]

We opened IXC. Before we opened, we put sheet (no electric charge) in front of port of cryostat.

Kunihiko Hasegawa checked shield and so on for his experiment (contamination of Fabry Perot Cavity in IYC).
Toshiro Ochi picked up some parts of his cryogenic accelerometer.

We also discussed schedule of experiments of Kunihiko and Toshiro.



FCL (General)
kazuhiro.yamamoto - 0:25 Wednesday 19 April 2017 (2692) Print this report
Vacuum furnace at University of Toyama
Yoichi Aso, Kazuhiro Yamamoto

They test vacuum furnace at University of Toyama. It works. But overshoot of
temperature is an issue. Nevertheless target temperature is 120 degree,
actual one was about 170 degree ! Yoichi called Sato-san (KEK).
Even if we use PID control, it is not so easy if target temperature is low.

Yoichi tries on Thursday (the day after tomorrow) again..
Anyway, if somebody would like to use, s/he must investigate how to control temperature
IN ADVANCE.

Photos are here.
https://photos.google.com/share/AF1QipMY4Z3c1nfEXoaCrAUY0U1yHtdC1KZmxfn0AG22uXp69vejrdUuhkzflRftxlW6Eg?hl=ja&key=THZYb2NCajZ3UHJiYTdjZGM5RkpoN0dMZ3VnU2dn
FCL (General)
kazuhiro.yamamoto - 19:00 Saturday 25 March 2017 (2635) Print this report
Comment to Ultrasonic washing mashine at University of Toyama (2631)
Toshikazu Suzuki-san used ultrasonic bath to wash parts for cryogenic payload installation at Yend.
Bath works.

Photos
https://photos.google.com/share/AF1QipPEyJFrPUSLnJisDTOctqvENt907YIHjUOCneGcgA5VtRSNIRio7Hg153Qwg2Mc7Q?key=Rm12QnB3encwQXc3XzFqVmdsTmx4UUxhSDdEUzFn
FCL (General)
kazuhiro.yamamoto - 21:39 Thursday 23 March 2017 (2631) Print this report
Ultrasonic washing mashine at University of Toyama
Ultrasonic bath (it can inculde basket (800mm*400mm*300mm)) was delivered.
Photos are here.

https://photos.google.com/share/AF1QipPOPUHSCuBSe9yNOSY0O_Ky6fUkrQLRS2ONfhAnis1L1E306UhTzqvGgDA9tpSpHQ?key=bGJ6cTByREtvRlRHN3A1cW1VX1ZTWHlJRmM5czNn
Comments to this report:
kazuhiro.yamamoto - 19:00 Saturday 25 March 2017 (2635) Print this report
Toshikazu Suzuki-san used ultrasonic bath to wash parts for cryogenic payload installation at Yend.
Bath works.

Photos
https://photos.google.com/share/AF1QipPEyJFrPUSLnJisDTOctqvENt907YIHjUOCneGcgA5VtRSNIRio7Hg153Qwg2Mc7Q?key=Rm12QnB3encwQXc3XzFqVmdsTmx4UUxhSDdEUzFn
CRY (Cryostat IX)
kazuhiro.yamamoto - 12:27 Sunday 05 March 2017 (2573) Print this report
Comment to Today's result of measurement vibration of six cryocoolers(full-power mode!!) (2561)
5th Mar. (Sun) Kazuhiro adjusted Luca's accelerometer.
CRY (Cryostat IX)
kazuhiro.yamamoto - 22:33 Saturday 04 March 2017 (2572) Print this report
Comment to Today's result of measurement vibration of six cryocoolers(full-power mode!!) (2561)
Progress in the last one week.

27th of Feb (Mon)

all cryocoolers (four cryocoolers for cryostat and two cryocoolers for cryoduct) started to work
(16:50 JST). We measured vibration before and after start of cooling. We observed cryocooler generates
vibration. Details are being analyzed.

Photo
https://photos.google.com/share/AF1QipPA0p75Ew1F-fx_iPahKElRBCBC77ZChmvsQxCpJReiasF8rD2Fk_0WNQ90zjO2GA?key=bjZkcTUyTjBXYTBOVUstNlBpeDlIb0JqVVA2dEJn

28th of Feb (Tue) - 3rd of March (Fri) : Vibration measurement and adjustment to compensate drift by cooling

4th of Feb (Sat) Kazuhiro adjusted Luca's accelerometer (vertical direction) to compensate drift by cooling.


CRY (Cryo-payload R&D)
kazuhiro.yamamoto - 19:20 Friday 03 March 2017 (2570) Print this report
HCB mission at Toyama (week of 27th of Feb 2017)
Kieran Craig and Takafumi Ushiba

HCB mission started at University of Toyama !

Kieran and Takafumi prepared in clean room.
Faro was also carried into clean room (Kitazawa-kun (undergraduate student of University of Toyama) and
Kazuhiro (now, he belongs to University of Toyama) supported).

Only problem is detergent. It must be neutralized (otherwise, chemical reaction happens on surface of Aluminum).
Unfortunately, it was not delivered in this week. On Monday of next week, we can wash part, we hope.

In the next three weeks, we repeats HCB practices a few times.

Photo
https://photos.google.com/share/AF1QipObgrlM_fsCYAdAZFenjFNbnqMN4CqYjgsv6UO_XTUe7SReDrqmmql-9jewo6-CKQ?key=ZEhiM2o4YjRmMVhhNzdtT2l6VUJhY20yQi16ZHZB
CRY (Cryostat IX)
kazuhiro.yamamoto - 15:34 Friday 24 February 2017 (2539) Print this report
Status at X front on 24th of February 2017(accelerometers)
Kazuhiro Yamamoto, Nobuhiro Kimura

Kazuhiro checked status of acceleromters in the morning.
All cryocoolers were stopped around 13:00.


Horizontal accelerometer
Error signal around 13:00 is between +7V and -13V.
(Before cooling, it was between +13V and -13V).
Contrast defect increased.


Vertical accelerometer
Output : +3.6V (10:10)
So, direction (sign) for compensation during cooking is NEGATIVE.
Kazuhiro adjusted. At 14:05, output was -30mV.

There are three SR560. Kazuhiro checked and found there is no large difference from point of view of noise.


Both accelerometers


Contribution of cryocooler for cryoduct on BS side is quite large.
When it is turned off, output of both accelerometer is small.
Whichever cryocoolers for main cryostat work or not, outputs of accelerometers
are comparable. Oscilloscope shows 200Hz contribution is large. So it could be
vibration but it might be electric one. We must check.

Kimura-san released screwbas along bellows between cryocooler (for cryo duct)
and cryo duct. But no change happened.


CRY (Cryostat IX)
kazuhiro.yamamoto - 22:20 Thursday 23 February 2017 (2537) Print this report
Cooling test for X front cryostat
Kazuhiro Yamaoto posts on behalf of Nobuhiro Kimura.

All electric cables are prepared. Around 3pm, all cryocoolers for main cryostat
started to work. Cryocooler for cryo duct on BS side is also in operation.
Kimura-san and Sawada-san found water leak around screws on water pipe for
cryocooler of cryoduct inside Fabry-Perot cavity. So, this cryocooler does not work now.

Tomorrow, status should be checked. Cryocooler for cryoduct inside cavity will be also checked
whether it works. In any case, all cryocooler will be turned off around noon of Friday.
If there is no problem, cooling test starts on Monday of the next week.

CRY (Cryostat IX)
kazuhiro.yamamoto - 18:12 Thursday 23 February 2017 (2534) Print this report
Status of X front cryostat (23rd Feb 2017)
Kazuhiro Yamamoto

Kazuhiro measured shield vibration in lunch time because it is quite.
Around 3 pm, finally, all four cryocoolers for main cryostat and one cryocooler
for cryo duct on BS side started to work !
Kazuhiro measured vibration again. So, there are two kinds of spectra; without and with cryocoolers
operation !

He wrote down status of accelerometers on lab notes. Let see what happens until tomorrow morning.
Around tomorrow noon, all cryocoolers will be turned off. If we have no problems on Monday,
cooling test will start !