Reports 1-1 of 1 Clear search Modify search
MIF (ASC)
kenta.tanaka - 1:12 Thursday 17 September 2020 (15050) Print this report
TMS GR QPD DC control loop modified

Nakano, Kenta

By rebooting Oplev control loop, we remade GR QPD DC control loop of ITMY and ETMY in Pitch direction. The U.G.Fs of both loops are about 0.1 Hz.

Tomorrow, remake the same loop of X-arm mirrors.

Images attached to this report
Search Help
×

Warning

×