Reports 1-1 of 1 Clear search Modify search
VIS (BS)
fabian.arellano - 18:18 Tuesday 19 November 2019 (11639) Print this report
Real-time model modification.

I modified the real-time model of the payload part in order to allow us monitoring the sum of the actuation signals in the IM degrees of freedom. The motivation of the change is the measurement of the transfer function from IM-Y and IM-P into DARM.

  • In the medm screen the monitror is between the sum block and the EUL2OSEM matrix.
  • The monitor is actually a filter bank, used to achieve a suitable naming convention.
  • The real-time model compiles successfully but I still need to install it whenever the suspension is available.
Comments to this report:
fabian.arellano - 17:13 Wednesday 20 November 2019 (11662) Print this report

These changes to the real-time model were cancelled. They were considered not necessary. Comments were written in the corresponding svn entry.

Search Help
×

Warning

×