AOS (Baffles & Beam dumps)
tomotada.akutsu - 20:36 Monday 25 February 2019 (8205) Print this report
WAB at EYC finalization

Yano, Akutsu

have brought the WAB traversers, screws, and so on to Yend. In the EYC clean booth, our desk was located at the opposite side of the opened flange, so we moved it to the opened side so that we can put tools and so on on the table.

In the cryostat, we found the heat links were already connected so the WAB traverser cannot be installed... so tomorrow Ushiba-kun would come to detach them.