Reports 1-1 of 1 Clear search Modify search
VIS (BS)
fabian.arellano - 14:06 Wednesday 23 December 2020 (15680) Print this report
IP horizontal fishing rod limit switches installation.

 With Hirata-san and Yano-san.

See pictures in the album BS Remedying work after O3.

We installed and tested manually the three pairs of limit switches:

  • The cable assignment can be seen in this picture of the notebook.
  • We pressed the switches with the finger and checked that the signal in the medm screen is the same as in the cabling diagram.
  • Due to the lack of clamping points we added dedicated vented M8 screws to use as poles where we tied the cables using a single thread of kapton cable. See this picture
Search Help
×

Warning

×