Here are cartoon summaries:
Attach 1 (top) - When the initial installation (probably)
Attach 1 (bottom) - On Apr 1, 2020, before the reapir (while entire commissioning so far)
Attach 2 - After repair.
Here are cartoon summaries:
Attach 1 (top) - When the initial installation (probably)
Attach 1 (bottom) - On Apr 1, 2020, before the reapir (while entire commissioning so far)
Attach 2 - After repair.